HIM
Mainz, Germany
DOI Title
10.18429/JACoW-IPAC2018-TUPAF088 Final factory-side Measurements of the Next SC CH-Cavities for the HELIAC-Project
10.18429/JACoW-IPAC2018-TUPAK002 Advanced Approach for Beam Matching along the Multi-Cavity SC CW Linac at GSI
10.18429/JACoW-IPAC2018-TUPAK003 Beam Dynamics Simulations for the New Superconducting CW Heavy Ion LINAC at GSI
10.18429/JACoW-IPAC2018-TUPAK004 Superconducting CH-Cavity Heavy Ion Beam Testing at GSI
10.18429/JACoW-IPAC2018-WEPAK006 Bunch Shape Measurements at the GSI CW-Linac Prototype
10.18429/JACoW-IPAC2018-WEPAL024 High Precision Beam Parameter Stabilization for P2 at MESA
10.18429/JACoW-IPAC2018-WEPML039 Design of the Two-Gap Superconducting Re-Buncher
10.18429/JACoW-IPAC2018-WEPML040 Further Tests on the Final State of the SC 325 MHz CH-Cavity and Coupler Test Bench Update
10.18429/JACoW-IPAC2018-WEPML041 Comparative Study of Low Beta Multi-Gap Superconducting Bunchers
10.18429/JACoW-IPAC2018-WEPML045 Infrastructure for Superconducting CH-Cavity Preparation at HIM
10.18429/JACoW-IPAC2018-WEPML046 Multipactor Discharge in Superconducting Accelerating CH Cavities
10.18429/JACoW-IPAC2018-THPMF062 Smith-Purcell Radiation for Bunch Length Measurements at the Injection of MESA